NDAA Section 889, TAA, and US-only chain of custody in tablet redaction
Modifying a tablet's logic board requires opening the chassis. For federal and defense buyers, where that chassis is opened—and who touches the board—is a Supply Chain Risk Management (SCRM) question.
For federal Supply Chain Risk Management (SCRM) and NDAA Section 889 compliance, tablet hardware redaction must be a strictly subtractive, US-only process. CBR Labs performs all work at our Alexandria, Virginia facility using background-checked US staff, adds zero third-party chips or firmware, never connects customer devices to a network, and logs every hand-off by actor and timestamp.
- CBR Labs' process is 100% subtractive—we physically remove OEM sensors and radios without adding unvetted chips, interposers, or custom firmware.
- All work is performed in-house in Alexandria, Virginia (CAGE 14Y35) with zero offshoring and zero subcontracting.
- Benches are air-gapped; arriving tablets never touch our network and zero customer data is imaged or retained.
- Full chain-of-custody logs (with timestamped technician identities) can be exported as CSV or PDF for SCRM/ATO reviews.
Opening a tablet and reworking its logic board is an inherently high-trust operation. From a Supply Chain Risk Management (SCRM) perspective, sending government or enterprise hardware to an opaque broker who subcontracts board work overseas—or introduces unvetted components—creates more risk than it removes.
Here is how CBR Labs structures our operations to satisfy federal SCRM, NDAA Section 889, and domestic custody requirements.
1. Subtraction, not addition (NDAA Section 889 posture)
NDAA Section 889 prohibits executive agencies from procuring or menggunakan covered telecommunications equipment or components from designated foreign entities. Hardware redaction at CBR Labs is strictly a subtractive mechanical process: we physically remove existing camera, microphone, speaker, and radio components from your Apple or Samsung tablet. We never install third-party chips, interposers, modems, or custom firmware.
2. 100% US-based work in Alexandria, Virginia—zero subcontracting
Every device sent to CBR Labs is received, stored, redacted, verified, and packed at our facility in Alexandria, Virginia, minutes from the Pentagon and Washington, D.C.
We do not offshore, we do not broker work out to third-party repair shops, and we log the authenticated identity of the background-checked technician who performs every state transition in the device's chain-of-custody record.
3. Air-gapped benches and zero data retention
Devices are never connected to our corporate network during modification, and we retain zero customer data. Arriving devices are wiped prior to bench work and verified clean at pack-out.
Why 'subtractive-only' engineering is critical for zero-trust hardware assurance
In federal Supply Chain Risk Management (SCRM) under NIST SP 800-161 and NDAA Section 889 Part A and Part B, any modification to an information technology endpoint must be evaluated for two threats: (1) the introduction of counterfeit or foreign-controlled electronic components, and (2) unauthorized firmware/hardware implants introduced while the chassis is open.
CBR Labs eliminates the component-introduction vector completely by operating a strictly **subtractive** mechanical process. When a tablet is on our bench in Alexandria, Virginia, we only remove OEM sensors, microphones, speakers, and RF transceivers. We never solder third-party integrated circuits, microcontrollers, or interposer boards onto the device, and we never modify the bootloader or flash custom firmware.
- Zero active component additions: Only inert, non-conductive optical/acoustic aperture plugs and OEM-grade display adhesives are used during reassembly.
- Open-board photographic transparency: Because every unit's open PCB is photographed before and after component removal at high resolution, your agency's hardware assurance lab can visually inspect the board state without even opening the case.
- Authenticated technician chain of custody: Every action in our production database requires Zero Trust authentication and records the technician's identity and UTC timestamp.
SCRM audit checklist for Agency Authorizing Officials and CISOs
When completing your agency's Supply Chain Risk Management questionnaire for a CBR Labs procurement, verify and attach these four items:
- Verify SAM.gov active registration & CAGE 14Y35: Confirm CBR Labs LLC's domestic corporate standing, WOSB certification, and Section 889 representations and certifications in SAM.gov.
- Confirm US-only facility & zero subcontracting: All redaction operations occur at 5927 Tilbury Road, Alexandria, VA 22310 by background-checked US personnel.
- Archive the per-device open-board photo packet: Store the pre- and post-redaction PCB photographs as permanent supply-chain integrity baselines.
- Export the CSV chain-of-custody log: Request the full event log showing every state transition from `RECEIVED` to `SHIPPED`.
Supply Chain Risk Management (SCRM) Controls at CBR Labs
| SCRM Risk Vector | Unvetted Repair Broker / Offshore Shop | CBR Labs Alexandria, VA Facility |
|---|---|---|
| NDAA Section 889 / Foreign Components | Risk of counterfeit or covered replacement parts | Strictly subtractive — zero third-party electronics added |
| Subcontracting & Facility Location | Often brokered to third-party retail repair depots | 100% performed in Alexandria, VA; zero subcontracting |
| Firmware / Software Tampering | Unknown diagnostic tools connected to PC | Mechanical board-level removal; air-gapped bench workflow |
| Chain of Custody Traceability | Paper ticket only | Append-only digital event log with authenticated actor & photos |
Frequently asked questions
Does CBR Labs install any replacement microcontrollers, dummy loads, or custom firmware during redaction?
+
No. We never flash custom firmware or install active electronic components. Our process physically removes the targeted transducers and transceivers from the OEM board and seals the physical apertures.
Can our agency security team audit the chain-of-custody log for our purchase order?
+
Yes. Every state transition—Receipt, Intake, Queue, On Bench, Redacted, Verified, Cert Issued, Packed, and Shipped—is logged with an immutable timestamp and technician identity, and can be exported on request.
Are tablets wiped before and after redaction?
+
Yes. If a device arrives with any configuration or data, it is wiped prior to work and verified factory-clean before pack-out.
Has CBR Labs completed Section 889(a)(1)(A) and (a)(1)(B) representations in SAM.gov?
+
Yes. Our FAR 52.204-24 and 52.204-26 Section 889 representations and certifications are active and current in our SAM.gov entity registration (UEI K4MZG4KC1MY9).
Can our government quality assurance representative (QAR) perform random teardown inspections?
+
Yes. Because our work is physical and documented with per-serial internal photography, any random sample unit opened by your QAR or hardware assurance lab will match its Certificate of Redaction and post-work board photograph.
Written and reviewed by Rob Pfleghardt and the bench engineering team at CBR Labs LLC (5927 Tilbury Road, Alexandria, VA 22310). CBR Labs is an active SAM.gov-registered Woman Owned Small Business (CAGE 14Y35 · UEI K4MZG4KC1MY9) performing permanent, board-level hardware redaction on iPad and Android tablets.
Practical acquisition guides for Contracting Officers (COs), program managers, and compliance auditors: copy-ready RFP clauses, FAR Part 13 thresholds, CFE/GFE vs. turnkey, Section 889 SCRM, and Certificate of Redaction standards.
Why camera tape, lens epoxy, and microphone glues fail serious security audits
How to write RFP language for redacted tablets (with sample clauses)
What's actually in a Certificate of Redaction
Buying redacted tablets under Micro-Purchase ($10K) and Simplified Acquisition ($250K) rules
Need a supply-chain or SCRM attestation for your security review?
Contact us for vendor questionnaires, NDA execution, and custody documentation.